AproSoft Cap
The aim of capacity planning is to use the resources as efficiently as possible combined with short processing times and prevention of bottleneck situations. Basically it optimizes machine scheduling and determines the manpower requirements.
- Automatic machine sceduling
- Foreward and backward scheduling
- Automatic adjustment according to the current process stop times
- Manual editing of lot, process and scheduling data via drag&drop
- Fixing of jobs (not to be influenced by automatic adjustment)
- Parallel production: splitting of processes to multiple machines
- Overlapping production: consideration of overlapping times
- Calendar function including shift operation: work schedules and holiday planning, machine maintenance
- Conflict management
