AproSoft Cap

The aim of capacity planning is to use the resources as efficiently as possible combined with short processing times and prevention of bottleneck situations. Basically it optimizes machine scheduling and determines the manpower requirements.


Automatic machine sceduling
Foreward and backward scheduling
Automatic adjustment according to the current process stop times
Manual editing of lot, process and scheduling data via drag&drop
Fixing of jobs (not to be influenced by automatic adjustment)
Parallel production: splitting of processes to multiple machines
Overlapping production: consideration of overlapping times
Calendar function including shift operation: work schedules and holiday planning, machine maintenance
Conflict management